Navy sub Submarine HMCS Windsor on the Synchrolift March 31, 2014 PeterZ HMCS Windsor is being loaded on the dockyard synchrolift this morning. This work period is to repair/replace a faulty generator that was discovered during trials last fall. Related Posts Navy SPS PatiƱo – the Interm Interm AOR February 12, 2016April 30, 2025 PeterZ Navy tugs New Navy Tugs – Charter? December 2, 2015 PeterZ