cable Hiberina Atlantic Cable Started. April 29, 2015 PeterZ The cable ship resolute at anchor off the Herring Cove landing site. The cable has apparently been pulled onto land, and the shore based connections and testing are likely under way. Related Posts cable Responder Visits Pier 9 September 1, 2015 PeterZ cable Hiberina Express Cable Ship Resolute April 16, 2015 PeterZ