coming to its final Position, just off anchorage #5
Category: offshore
Arrived with a drilling platform Rowan Gorilla 3 to Anchorage 1. Currently with 8 cables (8/10ths of a nautical mile) of Anchor Chain (Rode) The rig will complete six months of work for Canadian Natural Resources starting in the third quarter of 2009. The work was valued at $55 million.
The Seajacks Kraken has unjacked itself today. Perhaps ready to depart for the Sable Gas Field?
And the AIS View:
Atlantic Oak and Mariner Sea.
M/V swan, Sister ship of Tern, which was in halifax earlier in the month to move HMCS Chicoutimi, has arrived with the Brand New Seajacks Kraken, which is on contract for the Sable project. fromOffshore Shipping Online: “Seajacks has confirmed that it has signed the final contract with ExxonMobil Canada
Under repair at Woodside Industries, the Accommodation platform was previously under repair in the Mobile river when it slipped off a barge during hurricane katrina, and floated downstream until it got stuck under a bridge. More Details via RigZone Arrived on April 12, expected to stay a year.
