{"id":979,"date":"2014-02-07T02:28:00","date_gmt":"2014-02-07T02:28:00","guid":{"rendered":"http:\/\/rescuenotes.ca\/?p=979"},"modified":"2014-02-07T02:28:00","modified_gmt":"2014-02-07T02:28:00","slug":"update-on-aops","status":"publish","type":"post","link":"https:\/\/rescuenotes.ca\/?p=979","title":{"rendered":"Update on AOPS"},"content":{"rendered":"<p>Today Federal Ministers offered an update on the AOPS Project.<br \/>\nThe first 2 of 7 phases of the 288 million definition contract were completed on time and on budget. This contract was<a href=\"http:\/\/blog.halifaxshippingnews.ca\/2013\/03\/contracts-signed-for-final-aops-design.html\"> announced in March 2013<\/a>. an additional 2 phases of the 7 phases have now authorized, valued at 53 million. (presumably phases 3 and 4) Phases 3 and 4 Include<b>&nbsp; <\/b><\/p>\n<blockquote><p>\n<b>Engineering Design Phase&nbsp;2<\/b>&nbsp;\u2013 This task will include<br \/>\n the system engineering activities, integrated logistical support<br \/>\nanalysis and supplier engagement activities that are necessary to<br \/>\ndemonstrate that the Arctic\/Offshore patrol ship design is a complete<br \/>\nand integrated solution that meets all the contract design specification<br \/>\n requirements with acceptable risk and within the cost and schedule<br \/>\nconstraints.<b>&nbsp;<\/b><\/p>\n<p><b>Engineering Design Phase&nbsp;3<\/b>&nbsp;\u2013 This task will include<br \/>\n the system engineering activities, integrated logistic support analysis<br \/>\n and supplier engagement activities that are necessary to demonstrate<br \/>\nthat the Arctic\/Offshore patrol ship design is a complete and integrated<br \/>\n solution that meets all of the contract design specification<br \/>\nrequirements and is ready for the start of vessel construction.<\/p><\/blockquote>\n<p>UPDATE: the 2 additional packages authorized were actually 3 and 5, Which are Engineering Design Phase 2 and&nbsp;the Project Implementation Proposal Development. The Project Implementation Proposal Development<\/p>\n<blockquote><p>\n<b>Project Implementation Proposal Development<\/b> \u2013 This task will encompass all the procurement, engineering, production and estimating activities required to develop the detailed project implementation proposal, including the required plans and a substantive cost for the implementation contract.<\/p><\/blockquote>\n<p>\nNo Number of vessels has been set yet&nbsp; &#8211; So it still stands at the vague 6-8<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Today Federal Ministers offered an update on the AOPS Project. The first 2 of 7 phases of the 288 million definition contract were completed on<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-979","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/rescuenotes.ca\/index.php?rest_route=\/wp\/v2\/posts\/979"}],"collection":[{"href":"https:\/\/rescuenotes.ca\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rescuenotes.ca\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rescuenotes.ca\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/rescuenotes.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=979"}],"version-history":[{"count":0,"href":"https:\/\/rescuenotes.ca\/index.php?rest_route=\/wp\/v2\/posts\/979\/revisions"}],"wp:attachment":[{"href":"https:\/\/rescuenotes.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=979"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rescuenotes.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=979"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rescuenotes.ca\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=979"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}